1 BEDROOM GROUND FLOOR APARTMENT PERFECT LOCATION WITH SPECTACULAR VIEWS

Please Quote Code: 4205

Price: £55000

 

Interior-Exterior Chines

  • PVC or Aluminum double glazing is available. (The decision right belongs to the Contractor Company when the time comes for assembly.)
  • All stairs and balcony railings are aluminum handrails
  • Cv Flat interior doors are manufactured as wooden case and winged, winged wooden wing according to its design.
  • For reinforced concrete curtain and exterior paint and decorative coating on brick exterior wall building materials.

Flooring’s: 1st class domestic or imported ceramics or parquet
Walls: Water-based paint on gypsum plate
Ceilings: Water-based ceiling paint
Cabinets: Laminate, lacquered or wood covered coat hanger
Wardrobes: Laminate, lacquered or wood covered cabinet
Fixture: First class domestic or imported fixture
Sink: Stainless steel imported sink will be provided
Sanitary ware: 1st class local or imported sanitary ware
Shower trays:
Ceramic shower room / acrylic shower tray
Accessories: 1 towel holder, toilet paper holder, soap dish and hanger assembly will be made of chrome-plated material
Site perimeter wall and interior lighting suitable for the project
There will be a suitable site pool and pool installation for the project.
Landscape and planting will be done in accordance with the project.
Hot water and heating: Solar energy systems and installations will be installed for each flat throughout the site.
Water tank: It will be 2 tons.
Air Conditioning Installation: Air conditioner infrastructure will be made in the living room and bedrooms
Earthling Installation
Telephone / TV / Internet Installation
Hall suitable for every flat project and the TV socket.
Internal internet cable infrastructure

 

Special Terms:

The customer must notify the changes on the inner wall within 20 days at the latest before the wall manufacturing begins.
Plasterboard or suspended ceiling is not included in our standards.
Our customers who want to apply must notify the facilities within 20 days at the latest before the installation begins.
Ceramics will be furnished, including the hall, corridor and kitchen contractor options.
Wet areas (kitchen, bathroom) will be ceramic on screed.
Tiles will be applied up to the ceiling height.
Price differences of the standard external ceramics and tiles will be covered by the customer.
Kitchen tiles will be made between the lower bangs and the upper cabinet.
The company will determine the flooring of the balconies and windowsills. (Cannot be changed)
Our customers who want different manufacturing in the above mentioned places will be born
By paying the price difference (workmanship + material) to the contractor company, they will be able to make their choice.
All our sanitary ware standards will be displayed at the vendors reported by our company.
Element, motor, booster, diver etc. maintenance of electrical appliances belongs to the customer 3 months after delivery
Delay caused by extra work will be added to the delivery date.
When the contractor company encounters any problems, it can carry out non-project manufacturing in order to reach a solution as soon as possible.
The desired changes after any manufacturing will not be taken into account.
The contractor company can replace the material with its counterpart so as not to cause delay due to lack of material.
The customer will be able to extract the extra(Worker + material), the contractor must pay to the contractor company in advance when requested. (If the payment is not made on time, the contractor applies the standard manufacturing.)
The customer cannot apply any external production. All manufacturing will be carried out by the contractor company

 To see more of our amazing properties please see our channel link below:

https://www.youtube.com/channel/UCgSeRhZVAw7_JseEEGhT7rQ

At A Glance…

• Location: Alsancak

• Property Type: Apartment

• Sale/Rent: For Sale

• Bedrooms: One

• Swimming Pool: Communal

• Garden: Communal Garden

• Parking: Communal

• Air Conditioning: Two Units